How to use shear stud connector/ welding studs for buildings

//How to use shear stud connector/ welding studs for buildings

How to use shear stud connector/ welding studs for buildings

Product name: welding stud, shear stud, shear stud connector
Standards: ISO13918:2008, AS/NZS1554.2:2003, AWS D1.1:2015
Product material: SWRCH18A, SWRCH15A, ML15AL
Surface treatment: natural, phosphatized and hot dip galvanized.
Manufacturing process: With the welding method to connect the fabricated steel slab section with a fabricated steel beam.
Product specifications: M10, M13, M16, M19, M22, M25
Practical application: High-rise steel structure building, Industrial plant building, Highway, Railway, Bridge, Tower, Automobile, Energy, Transportation facilities, Airport, Station, Power station, Pipeline support, Lifting machinery and other kinds of steel structure engineering
Product advantages: stable quality, complete specifications, big quantity in stock, good price, timely and thoughtful service
Notes(use):
1. Before welding, choose the suitable studs and ceramic ferrule, the parent metal(30mm≥X≥16mm).
2. Before welding, the welding stud should be inspected to ensure that there are no rust, oxide scale, grease, damp or other defects affecting the welding quality.
3. The ceramic ferrule should be kept dry. If the ceramic ferrule is damp due to the damage of the packaging, they should be dried before welding. The drying temperature is 120℃ and the insulation time is two hours.
4. There should be no oxide scale, rust or damp or other harmful substances affecting the welding quality within 50mm semidiameter of the stud weld site.
5. When the length of the feeder wire is less than 50mm, its cross-section should not be less than 35 square millimeters; at the same time, it must be a special power supply with sufficient capacity which is 100 KVA-150 KVA and should be rain-proof and sun-proof. The distribution box should be near the bolt welder, easy to break down when the power supplying. The minimum distance between the welder body and the wall or other obstacles is 20cm to ensure the airflow around the welder and to facilitate heat dissipation.
After-sales service: Quick shipment and 24 hours service
Transportation: Logistics distribution, containers, express direct, etc. Note: The company is in the fastener production center every day to all parts of the country logistics distribution vehicles to achieve convenient delivery, timely receipt.